Modern housing project in Zaprešić. The building has 3 floors and consists of 29 apartments. Apartments are two-, three- and four-room, NKP from 53.06 m² to 118.03 m².
Each housing unit will be equipped with air conditioning and underfloor heating. External PVC joinery will be installed, anthracite on the outside and white on the inside. The interior joinery will be wooden and also white. The entrance door of the building will be made of aluminum, and each apartment will have an anti-burglary door. The purchase of an outdoor parking space or a garage parking space is mandatory with the apartment. The building will have an elevator.
Planned move-in date: June, 2025. years.
LOCATION:
The facility is located in Zaprešić. The Klake Stop bus station (line 172) is only a 3-minute walk from the building, and the train station is a 10-minute walk away. Elementary school Antun Augustinčić Zaprešić is 13 minutes away by public transport and 4 minutes by car. Nearby there is a bakery, Kaufland, Lidl, City Administration of Zaprešić, Garden Center, hair salon and other amenities necessary for life.
Compare listings
Compare